Skip to content
FREE Shipping On Orders Over $399!

Ask An Expert

(410) 324-6322

Ask An Expert

(410) 324-6322

(410) 324-6322

Live Chat

Email Us

Hours:

Mon-Sat - 8am-10pm EST

Sunday - Closed

Hours: Mon-Sat - 8am-10pm EST
by Warming Trends Authorized Dealer

Warming Trends Push Button Ignition Kit with Mounting Bracket & 3/4" Key Valve

SKU PBIK3.0MBRKV34
What's Included?
Original price $309.00 - Original price $309.00
Original price
$309.00
$309.00 - $309.00
Current price $309.00

About This Product

The Warming Trends push button ignition kit is the simplest step up from a match: a battery-operated push button module and a spark igniter rod that mounts beside a burner jet. Press and hold the button, ease the key valve open, and the CROSSFIRE burner lights within about 5 seconds; the key valve sets the flame and shuts it off. One AA battery in the button stem, no wiring. This package adds the mounting bracket that holds the button and key valve side by side, a 3/4" key valve and two pre-mounted 3/4" street elbows. Warranted one year in residential use. from $309.

  • Model PBIK3.0MBRKV34
  • Brand Warming Trends
  • Series Push Button Ignition System
  • Ignition Type Push button spark igniter, battery operated
  • Electrical One AA battery in the button stem - no power supply
  • Fuel Type Natural Gas or Propane
  • Includes Push button control module with AA battery stem and spark igniter rod with wire; plus the mounting bracket, a 3/4" key valve and two pre-mounted 3/4" street elbows
  • Fits Model Warming Trends CROSSFIRE brass burners on an aluminum plate or pan (listed "with PBIK" on the certified-unit list)
  • Installation Spark igniter is screwed to the plate through a drilled hole, tip within .125" of a jet; module and key valve mount on the bracket
  • Warranty 1 year residential / 6 months commercial, repair or replace, labor not covered

Shipping & Returns

Free curbside freight delivery on every order over $399. Inspect the shipment before signing and note any damage on the delivery receipt — freight damage claims must be reported within 5 business days. Most items can be returned within 30 days of delivery as long as the product hasn't been installed, is in the same condition you received it, and all original packaging is intact. Return shipping and the original outbound freight cost are deducted from the refund, and a manufacturer restocking fee may apply. Custom and made-to-order products are final sale. Cancellations are free any time before shipment (custom orders excepted). Threshold and white-glove delivery upgrades are available — ask our team.

Full shipping policy · Full return policy · Questions? Call (410) 324-6322 — when you call, we answer.

Warranty

In the unlikely event your product experiences a defect, our technical team will guide you through the manufacturer’s warranty process. Here is a general outline of what to expect.

Due to the technical nature of our products, the manufacturer must perform troubleshooting to process a warranty claim. Your installer will need to troubleshoot the problem on-site while working in tandem with our technical team. If troubleshooting leads to what The Torch Guys deems as a defective part, we will submit a warranty claim to the manufacturer on your behalf. Before we submit the claim, we will ask you to review the terms and confirm your consent to proceed.

Once the claim is submitted, the manufacturer will review it and either approve or deny it. If they have all the information and accept the claim, your warranty replacement part(s) will begin processing for shipment. If, for any reason, the claim is denied or we need more information, we will notify you as soon as possible.

All warranties are processed as exchanges. You can expect to receive a prepaid return label for the defective part(s), which must be returned within 30 days of receiving the warranty replacement(s).

Warranty claims can take anywhere from 1-4 weeks to process, depending on the season. Given the length of time claims can take, we recommend you fire up your unit in late summer/early fall to ensure your existing fireplace is in good working order for the winter season.